Basic Info.
After-sales Service
Video Technical Support, Online Support, Spare PAR
Type
Sterilization Tunnel
Automatic Grade
Automatic
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Multi-Room Feeding
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Chute Pneumatic Combination Lifting
Transport Package
Wooden Case
Specification
6000X1200X1600mm
Product Description
Semi-automatic glass bottle disinfecting cleaning washing sterilizing machine
Equipment Description:
1.Used for bottled, cup with acidic beverages after filling the sterilization of heat preservation cooling. Can be automatically enter bottles, automatic the bottle, work continuously, automatic temperature control, automatic control level. Heat insulation section has insulation guard board
2.This product is the introduction of foreign advanced automation in water based on the assembly line into new product development, it is essential in filling production line of equipment.
3.The equipment is safe and reliable. High degree of automation, easy operation and maintenance. Reduce labor intensity and improve efficiency, etc., It is the ideal equipment. of beverage filling line .
Working principle
1.This product is mainly composed of frame, chain nets, sprinkler system and other components. The main motor is 0.75KW speed reducer, The speed of input is 1440 rpm.
2.It can drive main axis, through axis drives chain network , when the beverage finished filling enters to the equipment and through a transition plate (comb-shaped plate) chain net, The nozzles will starts spray and cooling to bottled drink .Finally, it will be output by transition plate and enters to next processing by conveyor belt .
3.The framework and other high-quality stainless steel profiles are used 1G18NI9TI quality materials. Its surface is welded by the fine processing. Therefore whole appearance of beautiful, smooth .Bright. The Framework is the machine support other part of skeleton ,it can ensures high strength and no deformation. Allow for easy maintenance .there are some input square holes during it's design.
4.The Cooling system it's purpose is to reduce its temperature. After hot filling products and through the mist of water.
Sprinkler system input water by centrifugal pump input to pump chamber of the water intake area. Then pump the water take it to top in the framework of distribution mains. Then enter the water distribution in the same height with the support tube. In each branch a certain number of specially equipped with a nozzle. It can crosses each other within the framework of uniformly distributed in the top. Due to the pump has a head of delivery and pressure of water. It will By a special umbrella mist spray nozzle. Spray large area. The cooling rate of the bottle is uniform.
5.Water input system is connected into the framework of cavity water intake area.it is bye the custome.
Technical parameter
Maximum capacity | 3000-4000B/H |
Suitable shape of bottle | High ≤ 300MM Diameter of bottle≤ 70MM |
Motor | 0.75Kw |
Chain net size | 12000X1066MM |
Speed of chain net | 0.47-0.48RPM |
Motor of water pump | 0.75X3 |
Head of delivery | 44M |
Flow chart of water pump | 11.7M3/H |
Temperature control of range | 35-80 ºC |
Overall dimension | L6000XW1200XH1600 |
Weight | 1300Kg |
Company profileCustomer visiting
Processing Equipment
Workshop connecting pipe fittingsWe will connect all the machines and pipes in the factory, simulate the operation in your factory, and disassemble and pack them into containers for transportation after they are qualified.Package shipmentTo better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
After sales and return visits
certificate
Tow year warranty
During warranty period,the spare parts is free. All spare parts will be supplied in cost price after warranty period
Remote services
solve basic questions by telephone,email,whatsapp,wechat and video call.
Engineer will go to buyer's factory to install, test machines, and teach buyer's staff how to operate, maintain machines.
Operating manuals will be sent with machine or by email.
Address:
Qingfeng Industrial Park, Shuangfeng Road, Leyu Town, Suzhou, Jiangsu, China
Business Type:
Manufacturer/Factory
Business Range:
Agriculture & Food, Electrical & Electronics, Industrial Equipment & Components, Manufacturing & Processing Machinery, Packaging & Printing, Tools & Hardware
Company Introduction:
Zhang jiagang Keerman machinery Co., Ltd is located in the lower reaches of the yangtze river Delta, with nantong city on the north across the river, we are a professional manufacturer of beverage filling machine and water treatment equipment, The company takes market as aim, science and technology as spirit, Service as life, and set up complete quality guarantee system, We regard reputation as our principle, our main products: Carbonated and non carbonated production line. Barfrel, cup of fruit juice beverage, tea beverage and alcohol beverage. As well as other production line, Our company is a comprehensive professional beverage filling machine and packing machine manufacturer which is focus on researching, developing and manufacturing, Through the founding of our company more five years, we have been emerging in the new area of beverage filling and packing machine. We introduce advanced and technical production equipment from German and Italy, The purpose of our company is introduciton more quickly, improvement more and innovation in scitntific and technological progresss to create a well competive in the drink machinery market. A fine tradition of honesty, the smile of customers it the service of our company, our high quality of service through the process of connecting with customers is the strong basic on this trade, High quality, well service forever.